CHANNEL TUNNEL (CHUNNEL) | ||
When England and France decided to link their two countries with a 32-mile rail tunnel beneath the English Channel, engineers were faced with a huge challenge. Not only would they have to build one of the longest tunnels in the world; they would have to convince the public that passengers would be safe in a tunnel this size. Tunnel fires, like the Holland Tunnel disaster, were common at this time. How did the engineers resolve this problem? They built an escape route. It took just three years for tunnel boring machines from France and England to chew through the chalky earth and meet hundreds of feet below the surface of the English Channel. Today, trains roar through the tunnel at speeds up to 100 miles per hour and it's possible to get from one end to the other in only 20 minutes! |
||
Chunnel Length - 174,240' (32 miles) |
||
Fast Facts At the time it was being built, the Chunnel was the most expensive construction project ever conceived. It took $21 billion to complete the tunnel. That's 700 times more expensive than the cost to build the Golden Gate Bridge! Many of the tunnel boring machines used on the Chunnel were as long as two football fields and capable of boring 250 feet a day. When construction began in 1988, British and French tunnel workers raced to reach the middle of the tunnel first. The British won. In the first five years of operation, trains carried 28 million passengers and 12 million tons of freight through the tunnel. Vital Statistics Location: Folkestone, England, and Sangatte, France |